The roofing felt actually got completed the previous afternoon, just in time before it started raining.  But, it wasn’t until this morning that I was able to take a picture of it.

The new roofing felt going up into the east peak behind where the decorative woodwork will be reinstalled.

Installing the first course, which is a self-adhesive roll of shingle type material.

Preparing to install the first course of actual shingles.

Leave a Reply