The south side of the Tower that I didn’t get completed last night…

And, the south side of the Tower completed scraping and re-nailing…

Time to tackle this area…

A while back, I noticed squirrels were chewing through the siding and the weather was getting colder, so I did a temporary fix, and covered the area with chicken wire to hopefully dissuade them from doing any more damage.

With the temporary repair removed, the extent of the damage can be seen…

The little suckers chewed al the way through the decking…

I removed most of the damaged decking…

I then cut a new piece of decking to fit the opening…

The new piece of decking installed…

This part will now need to be shaped to fit the contour of the Tower corner…

I used my oscillating tool to shape it…

Then, started adding the shingles back on…

It was beginning to get dark, so this is as far as I got…

Tags:

No responses yet

Leave a Reply