Kitchen – Phase 1.8.3 – New Drawers, Second Set Finishing, Continued

After drying over night, the drawer interiors got a final sanding with fine sandpaper…

Then, the outside was smoothed with the hand sander…

Ready to paint…

First coat of paint applied…

After the first coat of paint was dry, it got a quick sanding to smooth out any graining that was raised…

Second coat of paint applied…

The drawers now will be left to dry over night…

Categories:

No Responses

Leave a Reply

Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)