Category: East

There’s a fairly long length of this type of moulding that has either rotted away, or been destroyed by the squirrels on the east side of the Servant Quarters. This is the same type of moulding from the Front Porch roof. The profile almost looks like picture rail… The piece, after most of the old […]
Since the “quick paint” looks so good on the Carriage House/Garage, and we have a whole bunch of subpar paint that we bought on clearance several years ago, we decided to continue the process on the Servant Quarters. And, we’ll just continue on to the Main House, if we have enough paint… This is the […]
Removed all of the decorative shingles and other woodwork from the East peak.  Also began adding new pieces of wood to help ease the re-installation of the crown moulding. The second piece of new crown moulding backing board installed.
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)