Category: East

Removed all of the decorative shingles and other woodwork from the East peak.  Also began adding new pieces of wood to help ease the re-installation of the crown moulding. The second piece of new crown moulding backing board installed.
Projects At A Glance
  • Miscellaneous (6)
Archives
  • 2009 (2)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)