Breezeway Front – Demolition
Not really sure how original this cement work is, but it’s not in very good condition. Lots of rotted out wood at the bottom of the main part of the wall. The
Read More...Not really sure how original this cement work is, but it’s not in very good condition. Lots of rotted out wood at the bottom of the main part of the wall. The
Read More...Inside area of the curved wall with all of the bead board and window trim work removed. There is some old tongue & groove type flooring along the bottom of the wall.
Read More...We’re ready to begin rebuilding the remaining part of the Southern Breezeway wall. So, time to remove all of the interior woodwork to get down to the bare bones of the wall
Read More...While shopping for shade loving plants for the new bed in the Backyard, we also picked up a few new plants for the Courtyard. Since there will eventually be a trellis here,
Read More...Since this area only gets sunlight during the summer, we decided to make it into a shade bed. We picked out a variety of shade plants and we’ll see how they do.
Read More...Removed all of the decorative shingles and other woodwork from the East peak. Also began adding new pieces of wood to help ease the re-installation of the crown moulding. The second piece
Read More...Got the finishing pieces added to the right side of the front arbor. So, we can now consider the front section completed.
Read More...In preparation for the new roof, there’s a bit of work that needs to be done on this area, as well. Crown moulding removed from the peak. Some pieces of old wood
Read More...