We’re ready to begin rebuilding the remaining part of the Southern Breezeway wall. So, time to remove all of the interior woodwork to get down to the bare bones of the wall structure.

A picture before demolition of the area where the old drain pipe from the roof went through the wall.

A picture before demolition of the inside of the curved portion of the wall.

The area where the windows go, with all of the trim work removed.

Categories:

Tags:

No responses yet

Leave a Reply