The decorative trim pieces painted and ready to be installed.
The decorative trim pieces installed.
Entire tower side, completed.
Checking the other side of the tower to make sure that there wasn’t any leaks.
Categories:
Tags:
You must be logged in to post a comment.
No responses yet