Month: August 2021

The new frame parts are pre-primed, but there were a few spots where the primer was scraped off during shipment. So, to be safe, I sprayed those areas with some additional primer… Once the primer was dry, I gave the frame parts a coat of off white Rustoleum paint. The color is almost an exact […]
The new doors are pre-primed, but there are a few spots where the primer was scraped off during shipment. So, to be safe, I’ll be spraying those areas with some additional primer… Before priming. After priming the inside of the doors… After priming the outside of the doors… Once the primer was dry, I gave […]
It’s now been a few more years since the new doors I built began to fail. I’ve decided to go with a completely new plan… I special ordered this new cellar door system from Menards…
Yesterday, we took a trip to Paullina, Iowa, to visit ND Millwerk Salvage and Sales… I was able to buy two lengths of the bed moulding I’ve been in search of… And two of the upstairs door knobs, along with a door spindle & screws. I would highly recommend ND Mill Werk if you’re looking […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)