Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

Post one was placed back into position… Then, a long deck screw was used in each […]
The next day, the wood repair putty was cured, so it was sanded with the hand […]
The next day, I used the wood shaping tool to quickly knock down the dried construction […]
This project seems like it will never end… The top of this Post never seemed to […]
I feel REALLY stupid for not realizing this a lot sooner. After re-installing Post two, I […]
Post two, set into place… Then, a long deck screw was used on each side to […]
The contact areas got a coat of exterior primer. Old paint removed from adjacent areas. Area […]
Before the Posts can be re-installed, the area where they connect to the Porch roof had […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)