Month: July 2017

After less than three years, the marine resin and pea gravel walkway is failing. So, it’s all getting removed… Back to the drawing board…
Ready to begin repair work on the south side… I got all of the damaged strips removed from the first section… Help arrives to send new strips of shingles down as needed… First section, repair complete. The help, trying to figure out how to get back down… First section of repair, as viewed from the […]
New pond, completed. Now, it just needs some landscape work around it…
Let the second phase of this project begin… Prepping the area… With the circumference marked, it’s time to start digging… Starting to take shape… All of the dirt removed. New pond liner installed. Beginning to fill it with water. The fountain, originally, was a “self contained” piece. Meaning, it is hollow and has a holding […]
With the west side done, I now need to remove the roof jacks and move them to the south side… Roof jacks removed. Another shot of the completed repairs on the west side. The new shingle color is slightly different, but you can’t really see it from the ground… This side has the most damage. […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)