The wires from the last receptacle have been tacked into place. Then, the last bit of wiring was run… To the main electrical panel. We should now have two new circuits; one 20 amp receptacle in the Bedroom, and receptacles and light in the Parlor.
The loop of wire I had left in the Basement, was cut and fed up into the hole. Getting ready to install the new box… The new box installed, and the wires pulled back through… New receptacle, wired in… Installation, complete. Now, I just need to finish up the wiring in the basement and connect […]
This receptacle is tied together with the only receptacle in the Parlor. I’m currently rewiring the Parlor, so I need to open this one up and remove some of the wiring to move the Parlor receptacle to that circuit… After opening the receptacle. The short lines will get removed… Then, the old receptacle is rewired… […]
This was originally the only receptacle in this room, and it’s wired together with a receptacle in the Sitting Room (on the other side of this same wall). After being opened, you can see the old metal box… After removing the old metal box…
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)