Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

Expanding foam insulation was added to the small gap right above the inner door. Then, after […]
The nail holes were filled… Then, sanded smooth… And, finally, painted…
I used my scroll saw to cut the outline out of the plastic. The finished profile […]
I plan to replace all of the original brackets with Miratec. In order to try and […]
The area of the curved sections that will show through the cut outs, got a final […]
The area of the curved sections that will show through the cut outs, got another coat […]
Ready to begin installing the new trim pieces. Drilling the holes for the nails… Nailing down […]
All of the edges of the new window trim pieces got a coat of the light […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)