Month: April 2015

The second receptacle, completed… We’re now all of the way around the room to the very first hole I made in the wall. This will be the fifth receptacle. The fifth receptacle, completed…
The next piece of wire was tacked into place on its way to the next hole…
The wire will go up into this hole, eventually. Right now, there’s an existing receptacle here. So, I’m just bypassing it until we’re actually ready to switch the power on for this new circuit… The wire was tacked into place and then fed up through the hole…
The next hole needs to be here… The next hole was drilled… Then the fish tape was fed up through the hole…