Year: 2014

Here’s where the cabinet will be installed… I first mounted a temp, level piece of wood to help keep the cabinet in place during installation. The holes for the wall anchors were drilled… Then, the anchors were inserted. Then, the cabinet was attached to the wall with screws. How the old cabinet looks after installation…
Location for the final piece of the new chair rail… Final piece of the new chair rail, installed…
More gravel mixture added… Gravel, on a drying rack after being washed. More gravel mixture added… The areas that are done, look nice. Let’s hope this solution works…
I want to try a completely different approach for the space between the stepping stones; aeromarine epoxy and pea gravel. This is supposed to be the toughest stuff available, and it’s normally used to make driveways and sidewalks look fancy. I guess we’ll see how it stands up against Iowa’s weather…. Part one of the […]
Prepping more of the walkway… Anti-weed fabric installed. Put back more of the stepping stones…
Everything got a hosing off… Began putting back some of the stepping stones…
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)