Month: June 2013

Applying the paver locking sand… Paver locking sand, completed… Paver locking sand, watered in… Area around perimeter, leveled. New patio, complete.
Added in the remaining paver base… The paver base was then covered with anti-weed mat. The plastic pipes are supposed to help give you a reference for keeping the leveling sand at a consistent thickness. Started laying the pavers… Not really sure what the suggested point of using the plastic pipes was… The amount of […]
Picked up more paver base, along with some paver leveling sand, this evening. Not sure if this will be enough, or not… Adding more paver base up to the proper depth, while leveling it as we go. About half way there…
The digging/leveling is completed, so it’s time to compact the ground… Compacting, completed… Added in all of the paver base we had, but it looks like we’re going to need more…
Bought more paver base, this evening… And, the digging/leveling continues… The new patio will infringe on one of the old flower beds. So, I’ll just cut those timbers…
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)