Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

I added the door stop today… Looking much better than it did… View from outside…
I want to keep the look of the old, original inner door, so I’m going to […]
I ran a bead of construction adhesive around all of the frame parts today… Detail of […]
I picked up some shorter foundation screws… The shorter screws work a lot better… The old […]
I had planned to use these long foundation screws to secure the door frames to the […]
I’ll be using some old salvaged 2x4s to replace the originals. The replacement 2x4s, cut to […]
The wood door frame for the inner door is in pretty bad condition… Lots of chewed […]
Ready to install the new receptacle… All of the parts, gathered. GFCI receptacle, connected. And, the […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)