Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

Side strip, installed… Detail of the door latch area.
Now for the side strip… Side strip cut. This piece needed a strange cut at the […]
The old door frame isn’t wide enough to reach the frame parts… So, I’ll need to […]
Top door frame piece, with all of the old paint layers… All of the old paint, […]
Cleaned and ready for insulation… Not a lot of room for insulation, but I managed to […]
Cleaned out and ready for insulation. R-13 insulation added. Next section of wall board installed…
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)