Month: October 2010

Remaining strip of the new beadboard siding installed and painted. New beadboard installed in this area… Painting completed on this section. Painting completed on this section, as well.
Most of the new beadboard siding installed. The knot holes have been filled and sanded. This area still needs beadboard siding, as well… Patched up knot holes painted.
The new glazing, painted with the dark green exterior door paint (Woodford). Installed some new compression type weatherstrip around the door. How this portion of the wall looks with the back door painted. This area needs to be worked on next… Most of the new beadboard siding installed. The knot holes need to be filled.
Detail panels on outside of the door painted with the light green color (Northwest Trail). Inside, got a second coat of the regular dark green paint (Woodford). Detail frame panels on outside of the door painted with the dark purple color (Eggplant).
Inside, painted the regular dark green paint (Woodford). Outside of the door painted with the dark green exterior door paint (Woodford).
The back door, with new glass installed and primed… Painted the top, side, and bottom of the door with the dark green exterior door paint (Woodford). Inside will get the regular dark green paint (Woodford).
The first course of bricks were mortared into place, then another course was added on top… Then, another course of bricks were added to continue building up the new foundation wall. The final course of bricks were mortared in. Testing out how hard the paint is to remove from the back door. It’s so dry […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)