Month: June 2009

We’re now ready to tackle the Carriage House/Garage door issue… View of the back wall of the Carriage House/Garage. We need to do some demo & prep here… Current front wall of the Carriage House/Garage… This “I beam” needs to be installed from the front to the back wall. After removing a section of the […]
Main frame assembly completed, and the dark green (Woodford) base color applied to all of the inside surfaces. Corner braces added, and the dark green (Woodford) base color applied to all of the inside surfaces. Screen door, ready for the final paint application.
Some assembly completed, and the dark green (Woodford) base color applied. Corner braces primed. Here, the faces that will be hidden have been primed to add extra protection.
Dry fitting the main screen door frame parts, and making sure they’re the correct height and width to fit the door opening. With everything in order, it’s time to get the parts primed. Here, the faces that will be hidden have been primed to add extra protection.
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (32)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)