Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

Light fixture installed. New receptacle installed. Remaining wire tacked down under the stairs. New beadboard finished […]
New wiring that leads to the new receptacle run down to a new junction box. The […]
Wiring to the new receptacle, tacked into place under the stairs.
New wiring that leads to the light fixture, tacked into place. The wire run, tacked into […]
Wiring from the basement routed up to the new light fixture box. Wiring tacked into place… […]
New wiring dropped through the hole that leads to the new receptacle. Locating the position where […]
With the cedar plank all installed, it’s time to start working on making the rest of […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)