Month: June 2008

Added some of the old curve pieces of the crown moulding, and then used Bondo to fill in any gaps. Area still in need of crown moulding. More old crown moulding pieces getting cleaned up and ready to install. These pieces needed quite a bit of work. They have been glued and are currently drying. […]
Part of the dirt wall collapsed due to excessive rain. Luckily, the old water pipe that leads to the Servant’s Quarters kept the giant slab of dirt from falling and hitting our furnace. I was able to break the slab into manageable pieces and get it out of the way. I then cut the old […]
Projects At A Glance
  • Miscellaneous (6)
Archives
  • 2009 (2)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)