Moved all of the computers to the other side of the room, and then removed the remaining carpet and foam padding.
Removed a portion of the carpet. Now, to remove the foam padding and all of the staples they used to secure it…
The area where the old fixture was attached to the ceiling is kind of sketchy.. Lots of “hollow” sounding plaster… All of the loose plaster removed, and the new fixture box installed. Ceiling repaired and the new fan installed.
Upper part of the walls skim coated. Wall above the door got two coats of primer. There are a few spots that need some repair work.
Area primed. Area painted. Repair area blends right in with the rest of the wall.
Hole patched. Skim coated the area. Skim coated the area, a second time. Area sanded and ready for primer.