Next section of wire added to go to the other side of the room. Temporary receptacle cover added. Holes cut out for the new receptacle boxes. New receptacle boxes added, and wiring run. New receptacles added.
Starting on the other side of the room by drilling a hole where the next receptacle will go.
New wiring running over to the new switch. Note the old knob & tube wiring currently running the main light fixture. New wiring going to the main light fixture location.
New fixture box installed in the ceiling. More loose plaster removed. Plaster repaired around new ceiling fixture box. Wiring in the ceiling, ready for the new fixture. Wiring in the attic…
While we’re adding some wiring, why not remove the texture from the walls… A lot of the texture removed, and some of the loose plaster, as well. New light switch installed. Wiring in the ceiling, ready for the new fixture.
New wiring run to the switch box. New wiring run to the new receptacle boxes. New switch installed. New receptacle installed. New wiring run to the other new receptacles. New receptacles installed.
Since the Water Closet is in the Office, and currently has no light, we may as well add one… Only has the necessities… This originally was an actual closet for this room. So, it has the same tall ceilings, and it’s pretty dark up there. Holes drilled to start cutting the plaster for the ceiling […]
This room currently has one power receptacle. In order to make this a functional office, we’re gonna need to add a few more… Plotting out where the new receptacle boxes will go. Holes drilled to start cutting the plaster for the new boxes. Stuff kept “disappearing” and we ended up finding it inside the wall. […]