Month: July 2006

New post painted, top bar attached, and starting to add the horizontal bars. More horizontal bars ready to be installed.
The wisteria is really starting to grow, so it’s time to give it something to climb on… Setting one of the posts for the left side of the Arbor. Some wood clamped into place to keep everything lined up while the cement cures.
Entire first level built, as we as some of the second level.
Projects At A Glance
  • Miscellaneous (6)
Archives
  • 2009 (2)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)