Year: 2005

This is the hole where the old pipes used to go through to get down to the Basement. Added a piece of wood, from below, to act as a new foundation. Cut new pieces of red oak to fit into the spots where the floor was missing. Added some new wood on top of the […]
To finish the floor above, in the Dining Room where the old pipes used to come down to the Basement, we need to create a firm foundation. To achieve this, we just attached a piece of wood that completely covered the hole.  This should be enough to build up the floor above.
Got one window all stripped and began staining it.
Got all of the new shoe molding cut, fitted, and ready for stain. Ready to start stripping the paint off of the window frames.
Door sanded and ready for stain. Applying the stain.
Close up of the finished repairs.  This one appears a little dark in the photo, but it looks like a closer match in real life. Same with this one. For some reason, the camera makes the repaired area appear slightly darker than it actually is. This blended quite well.  it’s hard to even tell where […]
Kitchen door frame, all finished. Foyer door frame all finished, and one small bit of paint still needing to be removed from the door.  Then, this side of the door can be sanded and will be ready for stain.
Projects At A Glance
  • Miscellaneous (5)
Archives
  • 2005 (76)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)