Our Latest Progress

Below is a "quick access" listing of the latest project(s) we're currently working on.  This area gets updated fairly regularly, so please check back often to see what we've been up to!

It was a fairly nice day today, as far as November goes.  So, I took advantage […]
With the floor refinishing complete, it’s now time to reinstall the rest of the woodwork.  We […]
We left the room closed up for 3 days after applying the second coat of clear […]
Time to get started on restoring the old windows.  There are a lot of advantages to […]
After the first coat of clear coat had dried for 24 hours, we lightly sanded it […]
Clear coating was done in the same method as the staining.  The key is always keeping […]
Once the first coat of stain was dry, a second coat was added.  The old fir […]
After all of the floor edges were sanded, we used a shop vac to get as […]
Projects At A Glance
  • Servant Quarters Chimney (1)
Archives
  • 2022 (129)
  • 2021 (76)
  • 2020 (99)
  • 2019 (19)
  • 2018 (53)
  • 2017 (35)
  • 2016 (62)
  • 2015 (80)
  • 2014 (72)
  • 2013 (34)
  • 2012 (123)
  • 2011 (95)
  • 2010 (46)
  • 2009 (86)
  • 2008 (84)
  • 2007 (59)
  • 2006 (61)
  • 2005 (127)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)