Month: June 2003

  The third course of (pointed, medium purple) shingles reinstalled on the lower left-hand side.
The roofer didn’t have the proper, needed equipment to gain access to the front of the tower roof, so he built this contraption… The roofer, scaling the ladder to the tower roof… The roofer, getting ready to get busy…  I always wondered if at any point he thought to himself, “Is this REALLY a good […]
The last of the new shingles being installed on the west side of the roof.
The first course of (straight, dark green) shingles reinstalled. The second course of (pointed, dark purple) shingles reinstalled on the lower left-hand side.
The roofer, finishing up adding the last bit of new felt, just before the rain starts.
Projects At A Glance
  • Miscellaneous (5)
Archives
  • 2005 (76)
  • 2004 (185)
  • 2003 (168)
  • 2002 (43)
  • 2001 (28)