Main House Roof – Reinforcing The Decking, South Side

With the large hole temporarily patched, the roofer began hauling 4 x 8 sheets of osb up to the top of the roof.  His plan was to put a new layer of osb over the entire south side of the roof.  I would have much preferred to just cut out the damaged decking and replace it with 1 x 12 boards.  The roofer didn’t want to have to “pull a permit” so we ended up doing it his way…

This entry was posted in Main House Roof. Bookmark the permalink.

Leave a Reply