Main House Exterior – West Side – Upper Peak Reinstallation

mhw-d-8

Support blocks installed to begin the process of reinstalling the upper west peak.

mhw-d-9

Here, the two (cream colored) soffit boards have been reinstalled.

mhw-d-10

The upper peak’s frieze boards, with the original decorative shingles.

mhw-d-11

The upper peak’s frieze boards, with the replacement decorative shingles.

mhw-d-12

The two (light green) fascia trim boards reinstalled.

mhw-d-13

Here, the two (cream colored) frieze boards that frame the shingles have been reinstalled.