Main House Eavestroughs – Bracket Installation, North & West Sides

mhet-d-72

The new brackets installed on the northern fascia.

mhet-d-73

The brackets installed on the western end of the northern fascia.

mhet-d-74

The new brackets on the northern end of the western fascia.  This is a good shot showing how the brackets are installed on the chalk line to obtain the proper drainage grade.

mhet-d-75

The final bracket.  This is the other angel bracket that matches the one on the other side of the tower.