Category Archives: North

Breezeway Back – The Restoration – Building The New Wall Continued

Dark purple drip cap added on top of the cement board skirt piece. Began adding the bottom divider boards under the windows. Originally, the bottom was sided with siding that ran the entire length of the wall.  We decided that … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Painted the window frames and installed the spacer piece so the cement board skirt piece can be installed. Cement board skirt piece installed.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Added the window frame pieces and finished painting the strip that runs across the top of the windows.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Added felt paper to the area between the windows.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Added the upper trim work above the windows.  Also painted the window detail pieces the dark purple color.

Posted in Breezeway Exterior, North | Leave a comment