Breezeway Roof – The Restoration – Preparing For New Joist Installation

SAMSUNG DIGIMAX 360

Paint removed from the upper area of the main house.  The old Breezeway roof was attached on top of the old siding.  To make a better, more secure connection, we’ll be removing the upper siding to secure the header joist directly to the wall studs.

SAMSUNG DIGIMAX 360

Here, the top pieces of siding have been removed.

SAMSUNG DIGIMAX 360

Siding removed above the door.

SAMSUNG DIGIMAX 360

New header joist placed into position.

SAMSUNG DIGIMAX 360

Different view of the new header joist where it will be attached.

This entry was posted in Breezeway Roof, East, Main House Exterior. Bookmark the permalink.

Leave a Reply