Breezeway Front – The Restoration – Preparing For The New Wall

SAMSUNG DIGIMAX 360

The level line has been attached to the top peak of the new roof joists.

SAMSUNG DIGIMAX 360

Then, we added another level line at the point on the joists where the slope ends.

SAMSUNG DIGIMAX 360

View of the area where the new wall is being built.

SAMSUNG DIGIMAX 360

I then used a circular saw set to the exact depth of the siding to cut out a section where the new front Breezeway wall stud will connect to the sheathing of the Main House wall.  I think this will give it a more stable and weather-proof connection.