Breezeway Front – The Restoration – Building The New Wall Continued

SAMSUNG DIGIMAX 360

Installed the first bracket, along with the dark green piece of woodwork that fits in between the soffit and fascia.

SAMSUNG DIGIMAX 360

With the window openings coming along, nicely, it’s time to start getting the actual windows ready to go back in.  This is one up the upper windows, as would be seen from the inside of the breezeway.  It has a lot of white paint on it!

SAMSUNG DIGIMAX 360

The same upper window, as seen from the outside.  Interesting to note, the old, original paint that was hidden up near the top.

SAMSUNG DIGIMAX 360

Some of the new bead board and new new trim pieces, painted.

This entry was posted in Breezeway Exterior, South. Bookmark the permalink.

Leave a Reply