Breezeway Back – The Restoration – Building The New Wall Continued

SAMSUNG DIGIMAX 360

New door sill installed and painted.  Also added in the top part of the doorway framing.

SAMSUNG DIGIMAX 360

Filled in the top part of the wall above the door with wall decking.

SAMSUNG DIGIMAX 360

Entire new section of wall now covered in felt paper.

This entry was posted in Breezeway Exterior, North. Bookmark the permalink.

Leave a Reply