Breezeway Back – The Restoration – Building The New Wall Continued

SAMSUNG DIGIMAX 360

With the new footing dry, it was time to install the new footer boards.

SAMSUNG DIGIMAX 360

New footer boards from outside the Breezeway.

SAMSUNG DIGIMAX 360

Added the second layer of footer board for the section of floor that is a step up just outside the Kitchen door.

SAMSUNG DIGIMAX 360

Second layer of footer board from outside the Breezeway.  You can see here how much higher the new floor will be than it is now.  The new floor will be about the same level as where the top of the ramp thing is.

SAMSUNG DIGIMAX 360

Installed the studs and started framing in the doorway.

SAMSUNG DIGIMAX 360

Added horizontal bracing between the studs and started installing the wall decking.

SAMSUNG DIGIMAX 360

Wall decking added to the small portion of the wall that faces west (we decided not to try and put a window back in this wall).

SAMSUNG DIGIMAX 360

New wall section as viewed from inside the Breezeway.

This entry was posted in Breezeway Exterior, North. Bookmark the permalink.

Leave a Reply