Breezeway Back – The Restoration – Building The New Wall Continued

SAMSUNG DIGIMAX 360

Dark purple drip cap added on top of the cement board skirt piece.

SAMSUNG DIGIMAX 360

Began adding the bottom divider boards under the windows. Originally, the bottom was sided with siding that ran the entire length of the wall.  We decided that it would look more uniform if the siding was broken up into sections like the front side of the Breezeway.  So, we’re breaking the wall into 3 sections, each with 2 windows.

This entry was posted in Breezeway Exterior, North. Bookmark the permalink.