Bedroom 2 – The Restoration – Staining The Woodwork

The entry doorway frame, completely stripped and ready for stain.

Baseboards and other parts with the stain applied.

Applying stain to the entryway door frame.

More pieces with stain, and a new piece being prepared for stain.

Finishing up the top part of the entry door frame.

This entry was posted in Bedroom 2. Bookmark the permalink.

Leave a Reply