Bedroom 2 – The Restoration – Reinstalling The Woodwork

SAMSUNG DIGIMAX 360

With the floor refinishing complete, it’s now time to reinstall the rest of the woodwork.  We laid out the pieces along the walls where they needed to go.

SAMSUNG DIGIMAX 360

The other pieces of woodwork, laid out.

SAMSUNG DIGIMAX 360

We just started at the entry door, and worked our way around the room, clock-wise.  This was the opposite of how the woodwork was removed.

SAMSUNG DIGIMAX 360

Around the closet door, and then under the windows.

SAMSUNG DIGIMAX 360

On to the north wall.

SAMSUNG DIGIMAX 360

Then, back around to the entry door.

SAMSUNG DIGIMAX 360

A shot of the entry door frame with the first part of the woodwork reinstalled.

SAMSUNG DIGIMAX 360

The top portion of the woodwork now reinstalled.

SAMSUNG DIGIMAX 360

West wall with the top part of the woodwork reinstalled.

SAMSUNG DIGIMAX 360

North and east walls with the top part of the woodwork reinstalled.

SAMSUNG DIGIMAX 360

The woodwork around the closet door reinstalled.

SAMSUNG DIGIMAX 360

The doors rehung.

SAMSUNG DIGIMAX 360

The closet door.

SAMSUNG DIGIMAX 360

The main entry door.