Bathroom – Plumbing – Supply Line Replacement Complete

SAMSUNG DIGIMAX 360

To begin installing the new supply lines, the toilet had to be removed to make room to work in the confined area of the ceiling cavity.

SAMSUNG DIGIMAX 360

The new supply line taps for the bathtub/shower.

SAMSUNG DIGIMAX 360

The creature that lives in the drain pipe was trying to escape!

SAMSUNG DIGIMAX 360

Sweating some pipe near the main drain stack.

SAMSUNG DIGIMAX 360

The cold supply line that runs to the toilet and then on to the bathtub/shower.

SAMSUNG DIGIMAX 360

The new supply lines for the sink.

SAMSUNG DIGIMAX 360

The supply lines where they come up through the wall, and then branch off to the sink (to the right) and the bathtub/shower (to the left).

SAMSUNG DIGIMAX 360

The new supply lines running behind the main drain stack.

SAMSUNG DIGIMAX 360

The new supply lines running to the toilet and bathtub/shower.

SAMSUNG DIGIMAX 360

How the supply lines were run up through the wall, next to the heat duct.

SAMSUNG DIGIMAX 360

The supply lines, near the Dining Room floor.

SAMSUNG DIGIMAX 360

The new supply lines connected to the old supply lines in the basement.  I also added valves so that we would be able to shut the bathroom off separately from the rest of the water supply, if need be.

This entry was posted in Bathroom. Bookmark the permalink.

Leave a Reply