-
Most Read
-
Recent Project Updates
- Main House Eavestroughs – Hardware Verdigris
- Main House Eavestroughs – Continued Fascia Repair, South Side
- Main House Eavestroughs – Fascia Repair, South Side
- Main House Eavestroughs – Fascia/Soffit Paint Removal, South Side
- Main House Eavestroughs – Fascia/Soffit Painting Completed, East Side
- Main House Eavestroughs – Fascia/Soffit Painting, East Side
- Main House Eavestroughs – Hardware Arrives
- Front Yard – New Flower Bed Border Installed
Projects At A Glance
Archives
Monthly Archives: April 2003
Bedroom 2 – The Restoration – Sanding The Floors
Having never sanded a floor before, I did quite a bit of research before we began. Here is a link to a very good article that basically tells you exactly how to do it: How to sand and finish wood … Continue reading
Posted in Bedroom 2
Leave a comment
Bedroom 2 – The Restoration – Clear Coating The Woodwork
Both doors with the first coat of clear coat applied. We went with an oil-based, satin finish polyurethane. Some of the other pieces of the woodwork with the first coat of clear coat applied.
Posted in Bedroom 2
Leave a comment
Bedroom 2 – The Restoration – Continuing Staining The Woodwork
One window frame with the first coat of stain. Some of the baseboards with the first coat of stain. Applying the first coat of stain to the other window frame.
Posted in Bedroom 2
Leave a comment
Bedroom 2 – The Restoration – Staining The Doors
Main entry door with final coat of stain, and closet door with first coat of stain applied and wiped off. Closet door getting the second coat of stain. Main entry door with second coat of stain wiped off.
Posted in Bedroom 2
Leave a comment
