-
Most Read
-
Recent Project Updates
- Main House Eavestroughs – Hardware Verdigris
- Main House Eavestroughs – Continued Fascia Repair, South Side
- Main House Eavestroughs – Fascia Repair, South Side
- Main House Eavestroughs – Fascia/Soffit Paint Removal, South Side
- Main House Eavestroughs – Fascia/Soffit Painting Completed, East Side
- Main House Eavestroughs – Fascia/Soffit Painting, East Side
- Main House Eavestroughs – Hardware Arrives
- Front Yard – New Flower Bed Border Installed
Projects At A Glance
Archives
Monthly Archives: December 2002
Parlor – The Restoration (Phase 1.2) – Fireplace Hearth Tile Grout
I just used a black grout and pressed it into the cracks with a stir stick. Finishing up the last bits of grouting. The finished product after the grout was dry and cleaned from the tiles.
Posted in Parlor
Leave a comment
Parlor – The Restoration (Phase 1.2) – Fireplace Hearth Tile
To finish off the hearth, we just added some slate looking tiles we purchased at Menard’s. All that’s left to do is add the grout.
Posted in Parlor
Leave a comment
Parlor – The Restoration (Phase 1.2) – Fireplace Hearth Edging
We purchased some oak veneer at Menard’s to use for the edging of the hearth. The first thing I had to do was to route out the area so that the veneer would sit flush with the oak floor. I … Continue reading
Posted in Parlor
Leave a comment
Parlor – The Restoration (Phase 1.2) – Fireplace Hearth
All of the bricks in the old hearth were loose and the mortar was pretty shot. Since we had the new insert put in, we figured we should do something to make the hearth look a little better. So, we … Continue reading
Posted in Parlor
Leave a comment
