- Main House Eavestroughs – Hardware Verdigris
- Main House Eavestroughs – Continued Fascia Repair, South Side
- Main House Eavestroughs – Fascia Repair, South Side
- Main House Eavestroughs – Fascia/Soffit Paint Removal, South Side
- Main House Eavestroughs – Fascia/Soffit Painting Completed, East Side
- Main House Eavestroughs – Fascia/Soffit Painting, East Side
- Main House Eavestroughs – Hardware Arrives
- Front Yard – New Flower Bed Border Installed
Projects At A Glance
Archives
Yearly Archives: 2001
Bedroom 1 – The Restoration – Window Hardware
All of the hardware was painted over with several coats of paint. This is a good example of what the sash locks looked like. The very same sash lock after all of the paint was removed. Why anyone would paint … Continue reading
Posted in Bedroom 1
Leave a comment
Bedroom 1 – The Restoration – Wall/Ceiling Priming
After the final sanding, it was time to prime the ceiling. Ceiling completely primed. We just used an interior water-based latex primer. Walls being primed with same primer. First coat of primer applied. First coat of primer on tower walls. … Continue reading
Posted in Bedroom 1
Leave a comment
Bedroom 1 – The Restoration – Ceiling Sanding
After the ceiling was completely patched with drywall compound, it was now time to sand it all smooth. This was not a fun job! Note to self (and anyone else who wants to save themselves a LOT of time), LESS … Continue reading
Posted in Bedroom 1
Leave a comment
Bedroom 1 – The Restoration – Woodwork Removal
Since the heat gun just wasn’t taking off the paint, we decided to just remove the woodwork so that we could use a chemical stripper. Removing the woodwork allows you to get all of the paint off, even the paint … Continue reading
Posted in Bedroom 1
Leave a comment