Main House Exterior – East Side – Upper Peak Reinstallation

With all of the pieces cut and painted, it was time to start reinstalling everything.  Here, the two (cream colored) soffit boards have been reinstalled.

This photo shows the two (light green) fascia trim boards reinstalled.

Here, the two (cream colored) frieze boards that frame the shingles have been reinstalled.

And, as the sky gets noticeably darker, it’s time to shut it down for the day and get ready for the approaching storms…

 

This entry was posted in East, Main House Exterior. Bookmark the permalink.

Leave a Reply