Monthly Archives: September 2004

Breezeway Back – The Restoration – Building The New Wall Continued

Damaged area all repaired with wood filler.  Just working on filling in any remaining low areas. Everything is much nicer looking now. A few small areas that still need to be sanded smooth before paint. Getting ready to build the … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Front – The Restoration – Building The New Wall Continued

Lower right sash glazing paint all trimmed. Straight on shot of the almost completed area.

Posted in Breezeway Exterior, South | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

First four window frames installed.  We were able to salvage about 2/3 of the original window sill, which was also reinstalled. Prepping the rotted out portion of the old window sill with wood hardener. Detail of the area that will … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Window frames all ready to be reinstalled.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Beginning to add the wall decking that goes below the windows. Also, adding the decorative curved wood that helps define the windows.

Posted in Breezeway Exterior, North | Leave a comment