Breezeway Front – The Restoration – Building The New Wall Continued

Repaired upper & lower sashes installed for the right window.  Middle bracket also installed.  Window glazing painted on the door windows and upper right sash. Another view of the door. Third, and final bracket in the middle of the painting … Continue reading

Posted in Breezeway Exterior, South | Leave a comment

Breezeway Back – The Restoration – Building The New Wall

Time to start building the new wall.  We began by removing the siding on the west side of the Servant Quarters.  This will allow us to attach the new wall directly to the Servant Quarters. All of the siding and … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Demolition Continued

Removed the back door and the interior bead boarding. Most of the interior walling removed. Removing the last remnants of the old, original porch roof. A lot of dust, dirt, and cobwebs! Removing the siding boards. Siding boards almost fall … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Demolition Continued

A shot of the bead board siding that runs under the windows the entire length of the back wall.  It’s not in that bad of shape down at this end. Near the center part of the wall, where it’s sagging … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Demolition

This is the condition the back part of the Breezeway was in after we boarded up all of the windows that the college renters broke out before we were able to get moved in. Not really sure why these two … Continue reading

Posted in Breezeway Exterior, North | Leave a comment