Monthly Archives: August 2004

Breezeway Back – The Restoration – Building The New Wall Continued

Added in some horizontal braces between the first two studs for extra stability. Area where the Breezeway roof connects to the Servant Quarters is pretty rough.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Installed all of the studs for the back wall,being careful to space them correctly so that the old window frames will fit back in place. View of the new studs from the other direction.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

New footer attached to the new footings.  We should now have a nice, solid foundation to build the new wall on.

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Back – The Restoration – Building The New Wall Continued

Added in a temporary piece of 2 x 4 onto the header boards to help indicate where the wall where the door is will need to begin. Prepping the area for the new footings. Corner footing form all ready for … Continue reading

Posted in Breezeway Exterior, North | Leave a comment

Breezeway Front – The Restoration – Building The New Wall Continued

Third bracket finished and installed.

Posted in Breezeway Exterior, South | Leave a comment