Monthly Archives: June 2004

Main House Exterior – East Side – Siding Reinstallation

New felt paper was added onto the wall sheathing.  Also, some of the new paint colors have been added to the top part of the window frame and the parts of the wood siding that were stripped. New felt paper … Continue reading

Posted in East, Main House Exterior | Leave a comment

Breezeway Roof – The Restoration – New Rubber Roof Installation Continued

With the main sections of the rubber roof adhered to the roof decking, we then got the area where it connected to the Main House prepped so that the siding could be reinstalled. We did the same thing where the … Continue reading

Posted in Breezeway Roof | Leave a comment

Breezeway Roof – The Restoration – New Rubber Roof Installation

The rubber roof installation was tedious and very messy, so we have no photos of the actual process.  In this photo, the main part of the rubber has been glued in place. The new roof, shortly after being glued down.

Posted in Breezeway Roof | Leave a comment

Breezeway Roof – The Restoration – New Flashing Installation

The new rubber roof has arrived, so it’s time to get the flashing installed.  I used the same aluminum that I used for the new drainage channels. View of the flashing against the Servant’s Quarters wall. Flashing around the wooden … Continue reading

Posted in Breezeway Roof | Leave a comment

Breezeway Roof – The Restoration – New Drainage System Installation

The new drainage system installation is now completed on the other side of the roof. The part that runs over the back door.  There’s not a lot of roof deck to work with here. View of both new drainage channels. … Continue reading

Posted in Breezeway Roof | Leave a comment