Monthly Archives: May 2003

Main House Roof – Roofing Felt Complete, South Side

The south side of the roof with felt installed.

Posted in Main House Roof | Leave a comment

Main House Roof – Finishing The Decking, South Side

The roofer, installing the osb on top of the original decking, against my better judgement. The roofer, proud of his installation job.  Me, shaking my head…

Posted in Main House Roof | Leave a comment

Main House Exterior – East Side – Upper Peak Replacement Parts

We used the original parts as templates to create replacement parts for the upper peak.  This is all of the main structural parts for the right-hand side. The original, and new replacement, structural parts for the left-hand side of the … Continue reading

Posted in East, Main House Exterior | Leave a comment

Main House Roof – Shingle Installation, East Side

Today, the roofer went back to the east side of the roof to try and finish installing the new shingles. In this shot, you can see the south side of the roof all tarped in case of rain.

Posted in Main House Roof | Leave a comment

Bedroom 2 – The Restoration – Putting Some Of The Pieces Back

To help reduce some of the excess clutter because of all of the house parts laying around, we decided to reinstall the woodwork that wouldn’t be affected by the floor refinishing.  Here, we have the various pieces that go around … Continue reading

Posted in Bedroom 2 | Leave a comment