Monthly Archives: February 2003

Bedroom 2 – The Restoration – Continuing The Rewire

The 20 amp line has now been run along the back of the north wall to the west wall. The 20 amp line continuing to the northwest corner. The 20 amp line connected to it’s receptacle on the west wall.

Posted in Bedroom 2 | Leave a comment

Bedroom 2 – The Restoration – The Rewire

The hole in the ceiling where the fan was attached, without using a fixture box… Enlarging the hole in the ceiling to install a fixture box. New wiring run through the east wall and up to the light switch. New … Continue reading

Posted in Bedroom 2 | Leave a comment

Bedroom 2 – The Restoration – More Prepping For The Rewire

Two new receptacle boxes in place on the east wall.  The old receptacle box on the floor is the original, single receptacle for this entire room. New receptacle box on the south wall. The backside of the north wall, as … Continue reading

Posted in Bedroom 2 | Leave a comment

Bedroom 2 – The Restoration – Prepping For The Rewire

The first new receptacle box installed, ready to have the new wiring run to it.  We decided the best, most non-intrusive way to run the wiring through the walls would be to run it within the area behind the baseboards.  … Continue reading

Posted in Bedroom 2 | Leave a comment

Bedroom 2 – The Restoration – Continuing Woodwork Paint Removal

Paint removal continues by using the heat gun to soften the thickest layers of old paint. The majority of the paint removed from around the door. The longest baseboards removed and ready for the old paint to be removed.

Posted in Bedroom 2 | Leave a comment